Extended Bid Deadline – 2018 115kV Transmission Line Pole Replacement Project

Public Utility District No. 1 of Whatcom County hereby invites qualified Electrical Contractors to submit Bid Proposals to complete the work as detailed in the Project Specifications for the 2018 115kV Transmission Line Pole Replacements.

The project location is along Public Utility District No. 1 of Whatcom County’s (Whatcom PUD) Transmission Line which begins at Dewey Substation and runs west to the Phillips 66 Refinery at Cherry Point, west of Ferndale, WA. Firms unfamiliar with such work and associated codes and safety regulations will not be considered.

Sealed Bid Proposals will be received by Whatcom PUD at 1705 Trigg Road, Ferndale, Washington 98248, until 10:00 a.m., local time, on the 3rd day of April, 2018 and then will be publicly opened and read out loud. Bids received after the time and date specified shall be considered non-responsive and will not be accepted by Whatcom PUD. Faxed or emailed bids shall not be accepted. To ensure consideration, the bid must be enclosed in an envelope marked, “Sealed Bid: 2018 115KV TRANSMISSION LINE POLE REPLACEMENT”.

Bidders, prior to submitting of a bid, shall attend a MANDATORY PRE-BID MEETING with Project Manager Alec Strand. This meeting will be held at 10:00 a.m., Wednesday, 7th March, 2018, at the Whatcom PUD Main Office located at 1705 Trigg Road, Ferndale, Washington, 98248.

Due to the size of the file, bid information has been separated into three (3) bid documents and three (3) map files:
For all bid information, click on the file name below to view or download:
Addendum No. 1
Bid Packet No. 1
Bid Packet No. 2
Bid Packet No. 3

Maps 1 and 2
Maps 3 and 4
Map 5

For information regarding this Invitation for Proposals, contact Alec Strand, Project Manager of Whatcom PUD, at telephone number (360) 384-4288 ext. 17 or facsimile number (360) 384-4849.